A HEURISTIC PROJECT SCHEDULING APPROACH

Document Type : Original Article

Authors

1 Prof. and Head of Prod. Eng. Dept.,Alexandria University.

2 Assist. Prof., Prod. Eng. Dept., Alexandria University.

3 Assist. Lecturer, Prod. Eng. Dept., Alexandria University.

Abstract

This work documents a conventional heuristic project scheduling .approach for solving multiple resource-constrained project scheduling problems. Thus, the intent of this paper, is to demonstrate the design aspects of a suggested heuristic approach for resource leveling to projects scheduling under limited resource availabilities, The typical characteristics of the suggested heuristic procedure are:
a- Resource leveling program utilizes the parallel approach.
b- Multi-resource constrained with variable, resource availabilities.
c- Make use of different priority rules
d- Possibility of activity splitting Test problem results are represented